Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Mar 07, 2021     12-2 empennage fairing step 2-4 Elevator Fairing - (20 hours)       Category: Tail Feathers
Trimmed elevator fairings. Inserted in elevator tip and matchdrilled. Installed aluminum band with epoxy to strengthen the structure (aluminum 0.025). Final drilled #30. Used flox to make smooth transition to the skins. work done over a full weekend. Sanded many times and added flox many times.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.